Leave your message to get our Quick response
edoxi automated message icon
KHDA Permitted Training Institute
Primavera P6 Professional Version 26

Primavera P6 Course in Dubai

Professionals reviewing project documents and discussing work during a meeting

Edoxi’s Primavera P6 course in Dubai is a 24-hour training program that teaches professionals to plan, schedule, resource and control large projects using Primavera P6. You build one project step by step on P6 Professional Version 26. Sessions run at Edoxi’s Dubai centre or live online. You leave with your own resource-loaded project schedule and an Edoxi Course Completion Certificate.

24
Training Hours
AED 1,800
Course Fee · Tabby instalments
Classroom · Live Online
Delivery Mode
12 Modules
One schedule, built end to end
P6 Professional Version 26
Software Covered
13-Nov-2026
Next Batch
whatsapp-chatWhatsApp an Advisor
★4.9 Course Rating (110 Reviews)
Reviewed by Jacqulin Johnson
Updated November 2026
Google 4.9 Star Rating
Edarabia 4.5 Star Rating
Laimoon 4.5 Star Rating

Get Batch Details & Fees

Speak with a course advisor within 2 hours

Validation
Validation
Validation
Validation

By submitting, you agree to our Privacy Policy and consent to be contacted.

Overview

What Does Edoxi’s Primavera P6 Course in Dubai Cover?

Edoxi’s Primavera P6 Course in Dubai is a 24-hour, 12-module programme that takes you from project setup to a resource-loaded project schedule. The syllabus covers Enterprise Project Structure (EPS), Work Breakdown Structure (WBS), activity coding, all four activity relationship types, Critical Path Method (CPM), constraints, baselines, reflection projects, and resource allocation. You train on Oracle Primavera P6 Professional Version 26 and build a complete project schedule through practical exercises.

led by Jacqulin Johnson spent nine years in project controls before moving into training. She holds PMP® and PMI-RMP® credentials, is Oracle-certified in Primavera P6, and has trained 500+ professionals across 35+ batches. Classes run at Edoxi’s Dubai centre or live online, with a three-day corporate training option. You work through one project step by step, developing a schedule with linked activities, a calculated critical path, assigned resources and a baseline.

The course prepares you for planning engineer, project scheduler and project controls roles across Dubai’s construction, infrastructure, interior fit-out, aviation and utilities sectors. On completion, you receive an Edoxi Course Completion Certificate, issued by a KHDA permitted training provider.

What is Primavera P6?

Oracle Primavera P6 is project management software used to plan, schedule and control complex projects. Planning professionals use it to organise activities, establish dependencies, calculate critical paths, assign resources and track progress against an approved project baseline. From high-rise construction to transport infrastructure, Primavera P6 helps project teams manage deadlines, resource requirements and interconnected work packages. Learning P6 Professional equips you with practical scheduling skills relevant to planning and project controls positions in Dubai.

Request Course Details Today

Validation
Validation
Validation
Validation
Validation

By submitting, you agree to our Privacy Policy and consent to be contacted.

Skills and Outcomes

What Do You Learn in Edoxi’s Primavera P6 Course?

Across 12 practical modules, you learn to plan activities, link them in a logical sequence, hold contract dates, allocate resources and build a resource-loaded project schedule in Primavera P6.

  1. Build the structure a project lives in

    An EPS node, a configured project and the working calendar every schedule date is calculated against.

  2. Break scope into a WBS that measures progress

    A work breakdown structure with weighted milestones, so reports show value delivered rather than activities ticked off.

  3. Load activities with codes and cost

    A coded, cost-loaded activity list, ready for any view, filter or cost rollup you need later.

  4. Link activities with all four relationship types

    A logic network using finish-to-start, finish-to-finish, start-to-start and start-to-finish links, so one slipped date moves everything downstream.

  5. Calculate the schedule and find the critical path

    A scheduled network showing total float and the longest path, recalculated whenever a duration or link changes.

  6. Apply constraints without hiding what they cost

    Contract dates held where they must be, with the float each constraint uses up kept visible.

  7. Test a resequence without losing the baseline

    A reflection copy where you try out a change first, then merge it back with the original project baselined.

  8. Assign roles and resources to every activity

    A resource-loaded schedule showing what each activity needs and what that demand costs across the project.

Curious about the assessment?

You build a sample project from your own industry, and passing it earns your certificate.

Curriculum

What Does the Primavera P6 Course Curriculum Cover?

The course has 12 modules across 24 hours. You build one project schedule step by step, from an empty database to a fully resourced plan, and finish every module with a practical exercise in P6.

Software and Tools

Primavera P6 Professional Version 26
Enterprise Project Structure (EPS)
Work Breakdown Structure (WBS)
Activity Codes
Critical Path Method (CPM)
FS
FF
SS and SF relationships
Baselines
Resource Allocation

Module 1: P6 Data and Calendars

Enterprise data · Project-specific data · Calendar types and working patterns

You build: a working calendar for your project schedule

Module 2: Building the Enterprise Project Structure (EPS)

EPS fundamentals · Project hierarchy · Creating an EPS node

You build: an EPS node to organise your organisation’s projects

Module 3: Creating a Project

Project creation · Project settings · Configuration and default preferences

You build: a configured project within your EPS

Module 4: Work Breakdown Structure (WBS)

WBS hierarchy · Breaking down project scope · Weighted milestones

You build: a WBS that measures progress by work value

Module 5: Adding Activities

Activity types · Activity costs · Activity codes

You build: a coded, cost-loaded activity list

Module 6: Relationships and Scheduling Logic

Activity dependencies · Finish-to-start (FS) · Finish-to-finish (FF) · Start-to-start (SS) · Start-to-finish (SF)

You build: a linked activity network showing project dependencies

Module 7: Scheduling the Network

Schedule calculations · Running the schedule · Automatic scheduling · Critical path and total float

You build: a calculated schedule with its critical path identified

Module 8: Constraints

Constraint types · Applying constraints to activities · Contract dates · Float impact

You build: a schedule with key contract dates and visible float impact

Module 9: Reflection Projects and Baselines

Reflection projects · Testing alternative sequences · Merging changes · Baseline management

You build: a what-if project to test schedule changes before updating the source project

Module 10: Formatting Schedule Data

Grouping activities · Sorting · Filtering · Customising schedule layouts

You build: a filtered schedule view tailored to your project team

Module 11: Roles and Resources

Understanding roles and resources · Resource definitions · Role and resource dictionaries

You build: a role and resource library for your project

Module 12: Assigning Roles and Resources

Assigning roles · Allocating resources · Resource assignment columns · Reviewing resource demand

You build: a resource-loaded schedule showing resource requirements and associated costs

Download the Primavera P6 Course syllabus to explore the module-wise curriculum, course fees, eligibility requirements and training details.

Your Instructor

Who Teaches the Primavera P6 Course at Edoxi?

Jacqulin Johnson

Jacqulin Johnson

Primavera P6 & Project Controls Trainer
Primavera P6PMP®PMI-RMP®SAP PSCICCMAACE CCPDeltek Acumen
7+
Years of Training
750+
Classroom Hours
500+
Professionals Trained
5+
Certifications

Jacqulin has trained 500+ professionals across 35+ batches and delivered 750+ classroom hours. She is a former Planning Engineer who now teaches the software she used on site. She has nine years of project controls experience, including roles at Descon Engineering and Euro Mechanical. There, she scheduled and controlled multi-million-AED EPC projects. She is certified in Primavera P6 by Oracle, and holds PMP®, PMI-RMP® and CICCM credentials. She teaches P6 through real Oil & Gas EPC scenarios, not textbook examples. Her classes run in English, Hindi and Malayalam.

Schedule and Fees

How Much Does the Primavera P6 Course Cost in Dubai?

Edoxi’s Primavera P6 Course in Dubai costs AED 1,800 for 24 hours of training across 12 modules. The fee includes course materials, a sample project, assessment and an Edoxi Course Completion Certificate. Choose classroom or live online training, pay upfront or through Tabby instalments, or enquire about customised corporate training.

Primavera P6 Course Fee

AED 1,800
Tabby instalments available

Included: 24 hours of instructor-led training | 12 modules | Practical sample project | Printed textbook and course materials | Course assessment | Edoxi Course Completion Certificate

Not included: VAT, added at payment | A software licence for practice at home

How to Get Certified in Primavera P6 in Dubai

Follow these four steps to complete your Primavera P6 training and receive your course certificate

  1. Complete all 12 modules through classroom or live online training.
  2. Build a project schedule from an empty database to a resource-loaded programme.
  3. Build a project schedule from an empty database to a resource-loaded programme.
  4. Receive your Edoxi Course Completion Certificate after completing the training and passing the assessment.

Primavera P6 Corporate Training

Train your project team through a customised 3-day Primavera P6 corporate training programme at your office or live online. We cover the same 12 modules, with the option to tailor the syllabus to your team's scheduling requirements and use one of your actual projects for practical exercises. Corporate training fees are quoted per team. 

Edoxi has trained teams from Aramco, EDF Renewables, Ista Middle East, and Petrofac

Certification

What Certificate Do You Get from Edoxi’s Primavera P6 Course?

After completing Edoxi's 24-hour Primavera P6 Course in Dubai, you will receive an Edoxi Course Completion Certificate and a KHDA-Attested Certificate. 

Edoxi Course Completion Certificate

Issued by Edoxi, a KHDA-permitted training institute in Dubai, this certificate includes the course name, training hours and completion date.

KHDA-Attested Certificate

You can also request a KHDA-attested certificate. It includes a QR code that employers can scan to verify the certificate online.

Career Impact

Is learning Primavera P6 worth it in Dubai?

Yes, for anyone moving into planning or project controls. Dubai’s 2026 budget puts AED 47.8 billion into infrastructure, 48% of total spending and a 20% increase on 2025. The roles that schedule that work, from planning engineer to planning manager, name Primavera P6 in the job specification, and consultants working to RTA specifications are recruiting for them now.

Why Primavera Skills Are in High Demand in Dubai? 

Dubai’s infrastructure pipeline is creating demand for project planning skills. The AED 20.5 billion Metro Blue Line contract was awarded in December 2024, and the project was 12% complete by December 2025, with 30 kilometres of track, 14 stations and more than 3,500 people working across 12 active sites. Project controls roles, including those at AECOM, require schedules aligned with RTA specifications and standard work breakdown structures.

Construction and property development are another source of demand. DAMAC awarded US$2.72 billion in construction contracts in the first half of 2026, while Dubai Holding awarded AED 5 billion to China State Construction in September 2026. Developers such as Azizi Developments also advertise planning engineer and fit-out planning engineer roles.

Primavera P6 skills are relevant across infrastructure, high-rise construction, interior fit-out and large-scale development projects, where teams need to sequence activities, manage dependencies, monitor deadlines and allocate resources.

How Much Do Primavera Professionals Earn in the UAE?

Planning roles in Dubai pay from around AED 9,000 a month at engineer level to about AED 26,000 for planning managers, depending on role and experience. The table below shows reported average and median pay for common planning and project controls roles.

Role, as advertised locally Level Monthly salary (AED) Source and sample
Planning Engineer Engineer 9,369 (average) Indeed UAE · 448 salaries · 6 Sep 2026
Planning Engineer Engineer 10,000 (median) Glassdoor Dubai · 2026 · Sample not disclosed
Project Controls Engineer Engineer 9,000 (median) Glassdoor Dubai · Sample not disclosed
Senior Planning Engineer Senior 21,000 (median) Glassdoor Dubai · 36 salaries · 2026
Planning Manager Manager 26,000 (median) Glassdoor Dubai · 2026 · Sample not disclosed

Figures come from platforms with different methods and samples, so they are not directly comparable. Indeed reports user-submitted salaries, while Glassdoor reports total pay, including additional compensation. These figures are market indicators, not guaranteed or starting salaries.

Top-hiring sectors: Roads and transport infrastructure, high-rise residential and building construction, interior fit-out, and aviation.

Companies hiring planning professionals in Dubai: AECOM, Parsons, WSP, Dar, Egis, Currie & Brown, ALEC Holdings, Khansaheb Bespoke Contracting, BK Gulf, Arabian Construction Company, Azizi Developments and Powerchina Huadong.

Sources: Dubai budget figures from MEED and the Dubai Media Office, November 2025; Dubai Metro Blue Line updates from the RTA and Dubai Media Office, November 2025–May 2026; employer listings from company career sites, GulfTalent and foundit Gulf, 13 August–11 September 2026; salary data from Indeed UAE and Glassdoor Dubai, read 11 September 2026.. 

Why Edoxi

Why Choose Edoxi for Primavera P6 in Dubai?

Edoxi’s Primavera P6 Course in Dubai combines Version 26 training, expert instruction and practical project exercises. Explore the key benefits below.

KHDA-Permitted Training Provider

Edoxi is a KHDA-permitted training provider offering Primavera P6 training in Dubai to help you develop practical project planning and scheduling skills.

Training on Primavera P6 Version 26

Learn using P6 Professional Version 26, released by Oracle in December 2025, and practise project setup, scheduling logic, baselines and resource allocation.

Trained by a Project Controls Professional

Jacqulin Johnson spent nine years in project controls before moving into training. She holds PMP® and PMI-RMP® credentials, is Oracle-certified in Primavera P6, and has trained 500+ professionals across 35+ batches.

Flexible Classroom and Online Training

Choose weekday or weekend sessions between 9 AM and 9 PM. Attend classroom training in Dubai or join live online sessions covering the same 12 modules and exercises.

Apply Your Skills to a Real Project

Discuss a project you are planning at work with your trainer and explore how to structure activities, link dependencies, establish baselines and allocate resources using Primavera P6.

Training at scale since 2018

Edoxi has trained over 75,000 professionals across 700+ courses.

Like every Edoxi programme, this syllabus is shaped by regional market research, tracking UAE hiring trends and consulting employers about what companies recruit for.

students-image

548 Primavera P6 Planning Engineer Jobs Listed in Dubai in September 2026

Source: Indeed (September 2026)

Reviews

What Edoxians Say About Their Journey

Hear from Edoxians about their learning experiences, career growth, and journey with Edoxi.

Compare

Primavera P6 vs Microsoft Project: Which Is Right for Your Projects?

For planning roles in Dubai, learn Primavera P6. Contractor and consultant job specifications name it, and it handles large construction and infrastructure programmes. Microsoft Project works well for single projects and smaller teams, and many Dubai employers ask for both.

Aspect Primavera P6 Microsoft Project
Dubai job market Common in planning engineer and project controls roles Often listed alongside P6
Project scale Manages multiple projects in a shared database Best suited to individual projects and smaller teams
Baselines Stores multiple baselines, with up to four assigned at a time Supports up to 11 baselines
Out-of-sequence progress Offers retained logic and progress override options Does not provide the same equivalent setting
Best for Large contractor and consultant programmes Smaller projects and internal planning

You don’t have to choose just one. Most Dubai planners use both, and this course teaches the one that takes longer to learn. 

Not sure which tool suits your career goals? Speak to our team for guidance.

Industry Applications

Which Industries Use Primavera P6 in Dubai?

Primavera P6 isn’t tied to one industry, but these five sectors are where Dubai hires for it most. Here’s how each one uses P6 and what you build in the course that it needs.

Industry What Primavera P6 is used for What you build in the course
Roads and transport infrastructure Scheduling work packages and coordinating project dependencies A logic network showing how delays affect downstream activities (Module 6)
High-rise residential construction Sequencing floor cycles against project handover dates Date constraints while tracking their impact on schedule float (Module 8)
Interior fit-out Coordinating overlapping trades within tight project timelines A schedule grouped and filtered by trade (Module 10)
Aviation Planning phased expansions while airport operations continue A reflection copy to test schedule changes before updating the live plan (Module 9)
Utilities and district cooling Coordinating plant and network installation across multiple sites An enterprise project structure with separate projects for each site (Module 2)

Tell your trainer which sector you work in at the start of the course, and the class exercises will use a project from your industry.

Location

Where is Edoxi’s Primavera P6 Training Centre in Dubai?

Classes run at Edoxi’s Bur Dubai centre on Khalid Bin Al Waleed Road, 100 metres from Burjuman Metro Station Exit 3.

Edoxi Training Institute

Office 504, Bank Street Building, next to Burjuman Metro Station Exit 3, Khalid Bin Al Waleed Rd, Dubai, UAE

View on Google Map
By Metro icon By Metro

Burjuman Station, the Red and Green line interchange, Exit 3, then a 100 m walk.

By Car icon By Car

Parking at Bank Street Building and nearby Burjuman Mall; taxis run 24/7 from the basement.

By Bus icon By Bus

Multiple RTA routes stop at Burjuman Metro Station.

Where is the Primavera P6 Training Centre Located?

Classes are held at Edoxi’s training centre in Office 504, Bank Street Building, Bur Dubai, right next to BurJuman Metro Station (Exit 3). The table below shows estimated travel times from key areas in Dubai and Sharjah.

AreaBy CarBy Metro or Public
Deira14 Min25 Min
DIFC16 Min37 Min
Downtown Dubai18 Min53 Min
Business Bay20 Min54 Min
Al Nahda, Sharjah30 Min1 hr 15 Min

Estimated off-peak via Google Maps, checked September 2026.

Not sure how to get here? Message us on WhatsApp for step-by-step directions to our Bur Dubai centre.

whatsapp-chatWhatsApp us
Frequently Asked Questions

Primavera P6 Course in Dubai: Frequently Asked Questions

Do I need any Primavera P6 experience to join?

No. Basic computer skills and a general understanding of project planning are enough to get started. Module 1 assumes you have never opened the software, and the course builds a complete project schedule from an empty database. An engineering or construction background helps but is not required.
Edoxi’s Primavera P6 course in Dubai runs for 24 hours across 12 modules. New groups start every month. If the scheduled batch doesn’t suit you, you can arrange weekday or weekend sessions at a time that works for you between 9:00 AM and 9:00 PM, subject to availability.
The course costs AED 1,800 plus VAT. You can pay in full or split the fee into instalments with Tabby. Our course advisors can confirm the payment options available to you.
You receive an Edoxi Course Completion Certificate, issued by a KHDA-permitted training institute in Dubai. It records the course name, training hours and completion date, so employers can see exactly what you covered. You can also request a KHDA-attested certificate, with a QR code employers can scan to verify it online.
 

Yes. You can choose classroom training or live online sessions, and the fee is the same for both. Both formats cover the same 12 modules and practical exercises with the same trainer. Classroom learners use the training centre’s computers, while online learners need a compatible Windows computer.

Yes. Edoxi offers the same 12-module syllabus as a customised three-day corporate programme, delivered at your office or live online. The exercises can be tailored to your team’s planning work, and the sample project can be replaced with one of your own. Corporate training is quoted per team rather than at the individual course fee.

Yes, if you choose the classroom option, where computers are provided. For practice at home or online classes, you need a 64-bit Windows 10 or 11 computer with at least 4GB of memory and 5GB of free disk space. P6 Professional does not run natively on macOS.

Yes. The course takes you through building a project schedule, calculating its network, identifying the critical path, setting a baseline, and assigning roles and resources. By the end, you can create a resource-loaded schedule with a baseline. Ongoing schedule updates, progress monitoring and earned value reporting require additional practice and are beyond the course’s main scope.

No. Primavera P6 is project scheduling software, while project management covers the wider methods and practices used to plan, execute and control projects. P6 helps you organise activities, dependencies, resources and baselines, but effective planning also requires an understanding of critical path method, earned value management and delay analysis. Edoxi’s Primavera P6 course focuses on using the software; a PMP qualification follows a broader project management pathway.

The course uses Primavera P6 Professional Version 26, released in December 2025. P6 can open files from earlier versions, although compatibility depends on the file format and the features used. XER is widely used to exchange project data but does not preserve baselines in the same way as P6 XML. Microsoft Project file compatibility also depends on the export format and the software version. If you need to exchange schedules with your office, confirm the required format before transferring files.

Yes, particularly if you work in construction, engineering or project planning in Dubai. Employers and clients may request familiarity with both tools, especially for large projects. Learning Primavera P6 adds skills in activity relationships, critical path scheduling, baselines and resource loading. However, Microsoft Project schedules may not transfer perfectly into P6, so you should expect to review imported data and correct any compatibility issues.

For roles that specifically require Primavera P6, start with P6 Professional. Oracle Primavera Cloud is a separate product with different capabilities and workflows, not simply a newer version of P6. P6 EPPM is another distinct product, designed for enterprise project portfolio and programme management through a web-based environment. Edoxi’s course focuses on Primavera P6 Professional rather than Primavera Cloud or P6 EPPM.

Start Your Primavera P6 Training in Dubai

Choose classroom training at Edoxi’s Dubai centre or join live online. Tell us which weeks suit your schedule, and our course advisor will help you find the next available group. 

WhatsApp IconWhatsApp an Advisor Call Now Call +971 4 380 1666

Join 500+ professionals who have completed Primavera training with Edoxi. The next batch starts on November 13, 2026.

Whatsapp Chat